"This rig was dreamed up and built by Sgt.Miller and Sgt.Blumer. The 396th needed something that could handle all the heavy objects that had to be moved in the process of salvaging and repairing the aircraft we worked on. They built this rig on a 6x6 chasis and there wasn't much that it couldn't handle. They received a lot of praise for the job they did." Caption courtesy of Elmer Bukey.